Proven Performance in Mission-Critical Environments

Every facility we serve demonstrates our commitment to reliability, speed, and quality. While we’re a new company, our team brings decades of data centre electrical experience to every project. Here are examples of our modular capabilities in action.

Hyperscale East

 Location: Virginia, USA

 Scope:
 5 Modular Electrical Rooms + 48 Custom PDUs
 
 Power Capacity:
 24MW, 2N Configuration
 
 Timeline:
 14 weeks from design to energization
 
 Key Challenges:
  • Accelerated timeline due to customer commitments
  • Integration with existing campus infrastructure
  • Phased delivery to match building readiness
 Key Features:
  • Fully integrated DCIM monitoring system
  • Seismic-rated electrical assemblies
  • Redundant power distribution architecture
 Results:
  • Reduced installation time by 65%
  • Zero change orders during implementation
  • 100% first-time commissioning success

Edge Network Expansion

Location: Multiple Sites, Western US
 
Scope:
12 Identical Edge Facility Electrical Systems
 
Power Capacity:
1.5MW per site, N+1 Configuration
 
Timeline:
8 weeks for first site, 3 weeks per additional site
 
Key Challenges:
  • Standardization across multiple locations
  • Limited on-site technical resources
  • Varying local code requirements
Key Features:
  • Standardized modular design across all sites
  • Remote monitoring capabilities
  • Simplified connection interfaces for local contractors
Results:
  • Consistent deployment across all locations
  • 75% reduction in on-site electrical labor
  • Network deployment completed 4 months ahead of schedule

Financial Services Data Center

Location: New York, USA
 
Scope:
Complete Electrical Infrastructure Replacement
 
Power Capacity:
8MW, 2N+1 Configuration
 
Timeline:
16 weeks with zero downtime
 
Key Challenges:
  • Live facility requiring zero downtime
  • Limited physical access for equipment
  • Strict financial industry compliance requirements
Key Features:
  • Custom-designed modular power distribution
  • Enhanced security and monitoring systems
  • Phased cutover strategy for zero downtime
Results:
  • Zero seconds of downtime during transition
  • 40% reduction in project timeline
  • Enhanced power reliability and monitoring capabilities

Cloud Provider Expansion

Location: Texas, USA
 
Scope:
3 Modular Electrical Rooms + Medium Voltage Distribution
 
Power Capacity:
36MW, N+1 Configuration
 
Timeline:
20 weeks from design to energization
 
Key Challenges:
  • Integration with utility-scale renewable energy
  • Extreme weather considerations
  • Rapid deployment requirements
Key Features:
  • Medium voltage integration modules
  • Weather-hardened enclosures
  • Advanced power quality monitoring
Results:
  • 7 months faster deployment than traditional methods
  • Successful integration with on-site solar generation
  • Enhanced resilience against extreme weather events

Note: Detailed project information will be added as we complete installations and receive client approval for publication.

 

We know where projects fail, and we’ve built our entire process to eliminate those failure points.